Model NO.
TF/TG
Emission Standard
Euro II
Fuel
Gas / Diesel
Service Life
6-10 Years
Size
Large
Color
Blue
Condition
New
Tyre Size
20.8-38/14.9-28(16.9-28/18.4-42)
Gear Shifts
16f+16r
Weight
7750kg/ Double Tire 8200kg
Engine
4 Cylinder/6 Cylinder
Cabin
AC
Transport Package
Iron Frame
Specification
Standard
Trademark
Huabo
Origin
Shandong, China(Mainland)
HS Code
8701931000
Production Capacity
1000pieces/Month
After-sales Service:
1.5 Years
Warranty:
1.5 Years
Type:
Wheel Tractor
Usage:
Farm Tractor, Garden Tractor, Lawn Tractor
Certification:
ISO, CE
Drive Wheel:
4WD
Chinese Agriculture Hand Tractor Cheap Price



Products Model | 2104 |
Wheel Drive | 4x4 |
Dimension(L*W*H)mm | 5400x2460 (Double tire) x3140(to the muffler) |
Weight(kg) | 7750 |
Front wheel Tread(mm) | 1990 |
Rear Wheel(mm) | 1840 (1820-1910) |
Wheel Base(mm) | 2890 |
Minimum Land Clearance | 430mm |
Gear shifts | 16F+16R |
Tyre Size | 16.9-28/20.8-38 (Double rear tire:16.9-28/18.4-42) |
Steering gear | Hydraulic steering |
Rear Suspension | Three-point Suspension |
Engine Specification | |
Engine Model | YTO LR6M3ZU23 |
Type | Water cooled ,Vertical,4 stroke and Direct injection |
Rated Power(kW) | 154 |
Rated Revolution(r/min) | 2200 |
Start Way | Electricity Start |
Transmission | (1+1)×4×4 shifts |
Clutch | Single disc,Dry friction, Double clutch. |
PTO Speed | 8 spline 540/1000 |



compact tractor:
1.Nude package
2.Iron frame for SKD(Easy to Assembly in Destination)
Delivery Time:20 days after received your advance payment






Services for you:
1. Color - Any color you like, we can paint it for you.
2. Warranty time - We supply you 18 months warranty time.
3. Spare Parts - For easy-damage parts, we will send you together with the tractor for free. And in the warranty period, if the spare part does not work because of the quality, we will send you new parts for free.
Procedures of order:
Step 1: 3-5 working days the payments can arrive at our account;
Step 2: We need 3 weeks to finish the farm tractors;
Step 3: CIQ inspection need 3-5 working days;
Step 4: Local transportation and Customs clearance needs 3-5 days.
Payment terms:
1. 30% T/T in advance, 70% T/T before shippment
2. L/C at sight only in large quantity
Send Message