1/2" Open End Bulge Acorn Wheel Lug Nuts For Jeep CJ5 CJ7 CJ3 Offroad 4x4
Condition: | New | Manufacturer Part Number: | 1/2" INCH Open Ended Lugs |
Style: | Open End Bulge Acorn | Interchange Part Number: | .83" Tall - Short Lugs |
Seat: | 60 Degree | Other Part Number: | Lugs, Wheel Nuts, Wheel Lugs, Lug Nuts |
Drive: | 3/4" | Placement on Vehicle: | Left, Right, Front, Rear |
Height: | .83" | Surface Finish: | Zinc |
Width: | .91" | Warranty: | Yes |
Threadpitch: | 1/2" | Finish: | Zinc Plated |
Material: | Steel |
- Ensure that these are the correct 1/2" thread pitch for your vehicle
- Verify that 3/4" is the correct outside hex size that is needed
- Ensure that your wheels are a 60 Degree Conical
- On vehicles that are older than 1960 make sure that you have all right handed Threads
Fitments:
Notes | Year | Make | Model | Trim | Engine |
2014 | Jeep | Wrangler | All | All | |
2013 | Jeep | Wrangler | All | All | |
2012 | Jeep | Wrangler | All | All | |
2011 | Jeep | Wrangler | All | All | |
2010 | Jeep | Grand Cherokee | All | All | |
2010 | Jeep | Wrangler | All | All | |
2009 | Jeep | Grand Cherokee | All | All | |
2009 | Jeep | Wrangler | All | All | |
2008 | Jeep | Grand Cherokee | All | All | |
2008 | Jeep | Wrangler | All | All | |
2007 | Jeep | Grand Cherokee | All | All | |
2007 | Jeep | Wrangler | All | All | |
2006 | Jeep | Grand Cherokee | All | All | |
2006 | Jeep | Wrangler | All | All | |
2005 | Jeep | Grand Cherokee | All | All | |
2005 | Jeep | Wrangler | All | All | |
2004 | Jeep | Grand Cherokee | All | All | |
2004 | Jeep | Wrangler | All | All | |
2003 | Jeep | Grand Cherokee | All | All | |
2003 | Jeep | Wrangler | All | All |
What is a wheel nut?

Do new rims need new lug nuts?



Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters .
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. (Other payment term can be acceptable after discussion.) We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CIF, DAP.
Q4. How about your delivery time?
A: Generally, it will take 20 to 35 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.