15T/25T
Globle Service
3year
Non-standard Sling
Steel
>6T
Welding Type
Folded Eye
Steel Core
Hydraulic
Flat
GS, CE, RoHS
Yellow
2.2t/3.8t
Yellow
No Power
30days
enjue
Nude Packing
20ft 40ft 53ft
China
8431499900
Product Description
Shanghai ENJUE Semi-Automatic Container Spreader/Shanghai ENJUE manual mechnical container lifting spreaders/ISO 20feet 40feet semi-Automatic manual I type Container lifting beam/cargo lifting frame 15t/25t/35t Nonstandard lifting bar for port gantry crane customerized lifting rod with lifting sling lifting eyes, cargo lifting spreader for sale with ccs RS




2:technical data
3. Technical Parameter








2:technical data
Item | ||
Rated SWL | 25-35T | 32-45T |
Max. SWL | 40T | 50T |
Dead Weight | 1.2-3.0T | 3.0-5.0T |
3. Technical Parameter
Item | 20' | 40' |
Dia. of pressed wire rope slings | 32 mm | 36 mm |
Length of pressed wire rope slings | 3.5m per piece (4 pieces for each set) | 8.5m per piece (4 pieces for each set) |
Steel Frame | Material Q345B | Material Q345B |

Product description:
This customerized lifting beam is easy to operation. when loading cargo in the port
Features
1. Light weight
2. Semi automatic
3. Designed for use with cinventional ships and harbour cranes
4. Suspendend on the crane by hook or wire ropes.
This customerized lifting beam is easy to operation. when loading cargo in the port
Features
1. Light weight
2. Semi automatic
3. Designed for use with cinventional ships and harbour cranes
4. Suspendend on the crane by hook or wire ropes.



It,s usually Shipped by 45HQ or RORO vessel
Act as a good adviser and assistant of client, we can help them to get rich and generous returns on their investment.
1.Pre-sale services:
a: Design customised project for clients.
b: Design and manufcture products according to clients special requirement.
c: Train technical personnel for clients.
2.Services during the sale:
a: Help clients to find reasonable freight forwarders ahead of delivery.
b: Help clients to draw solving plans.
3.After-sale services:
a:Assist clients to prepare for the construction scheme.
b:Install and debug equipment.
c:Train the first-lin operators.
d: Examine equipment.
e: Take initiative to eliminate the troubles immediately.
f:Provide techical exchanging.