Expandable mobile cabin / tiny home / portable building / caravan
Studio apratment on wheels
We can custom make any floor plan to suit so the possibilities are endless
As a tow-able 'trailer' no council building permit generally needed. These cabins come standard on a galvanised trailer custom build for this cabin. Register this cabin and tow it anywhere
Specification | |
Product Name | off road caravan |
Accommodates | Sleeps (3) to (4) adults |
All Aluminum Flex-Frame | Assisted gas strut roof lift |
Steel Jack Brackets | Window(s) with privacy curtain(s) |
Light | LED lighting |
Body structure: | Fibreglass + light wood board |
Type | Lightweight |
Bed: | 1 Big size bed |
Function: | Off-road camper trailer |
Floor: | Optional color vinyl flooring |






Noted: Price depends on size and configuration
1.The Body size and color is not fixed, you can have your own size and design.Customization is available...
2.Any uncertain trailer design, don't be hesitate to talk to us.
Tips: You can custom made whatever you want, such as trailer size,configuration, inner layout, AC, air vents and etc.so if any great idea, just feel free to Contact US.

package | normal package or customized |
shipping | within 50 days |
1. Are you trading company or manufacturer?
We are a manufacturer. So we have a warranty plan for the body and parts.
2. Is customized order accepted?
In our workshop, customization and modification are always available, we have built the customized trailers projects for more than 6 years.For example , the trailer color, trailer dimension, inner layout, wood color and etc, all can be built by our like and requirement.
3.Are they come with Austraila standard or other standard?
Our biggest market is australia, chassis is designed by the australia rv industry asspociation engineer to meet the AU standard to export to other country. Our campers and caravans also will changed to adapt that country standard, including us standard and EU standard.
4. what is the delivery time?
Usually the production time is 40 working days after deposit received, if need to make changes on your modle, it will be a little longer.