Model NO.
4089500/3090450/3090460v
Application
Excavator, Lawnmower, Tractor, Boat, Truck, Car
Surface Treatment
Oxidation
Engine Type
Diesel
Material
Cast Iron
Type
Oil-control Ring
Transport Package
Neutral Packing or Your Desired Packing
Specification
aluminum
Origin
China Shiyan
HS Code
8409100000
Production Capacity
600 Mount
After-sales Service:
6 Month
Certification:
RoHS, ISO 9001, CE
Warranty:
24 Months
Chongqing Commins Ccec Kta19 Piston Ring 4089500/3090450/3090460/3801056
Product Photos:





Company Information:
Shiyan Xinghong Machinery Co., Ltd is a Professional engine spare parts supplier for truck, marine, construction machinery, power generation equipment.
Piston, Piston Ring, Piston kit, Turbocharger, Fuel Pump, Oil pump, Water Pump, Cylinder liner, Cylinder head, Rocker Arm, Fuel injector, Sensor, Gasket, ECM, Crankshaft, Camshaft, Engine connecting, Tensioner belt, Connecting Rod, Intake Valve, Starter Motor, Alternator, Filter...Available
Our main products include :
1, B, C, L, QSB, QSL9, QSM11, QSZ13, X15, NTA855, M11, K19, K38, K50 Engine Spare Parts.
2. C320D, C7, C9, C11, C13, C15 Engine Spare Parts.
3. 4D95, 6D102, 6D107, 6D114, 6D125, 6D140 Engine Spare Parts.
4. D6D, D6E, D7D, D7E, D11, D13 Engine Spare Parts.
5. 4TNE84, 4TNE94, 4TNE88, 4TNE98 Engine Spare Parts.
6. R215LC-7, R225LC-7, R275LC-7, R305LC-7, R335LC-7, R385LC-7, R495LC-7 Engine Spare Parts.
Global Market:
Asia: South Korea, Japan, India, Indonesia, Malaysia, Singapore, Thailand, Vietnam...
America: USA, Canada, Columbia, Mexico, Brazil....
Middle east: U.A.E, Israel, Egypt, Saudi Arabia, Oman...
We sincerely wish to establish long-term and firm business relationship and friendship with each new and old customer.
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Mostly goods can send within one week. For large quantity order, need about one month to prepare.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Product Name | Chongqing Commins Ccec K19 piston ring |
Parts Number | 4089500/3090450/3090460/3801056/3803472/3903977/3096685/4095009/3631248 |
Weight | 0.20 kg |
Warranty | 6 months |
MOQ | 1 Set (6 pcs) |
Packing | Genuine Packing/Neutral Packing |
Delivery Times | 7 Days |
Product Photos:



All Spare Parts for Cumins Engines Available | ||||||||
EQB125 | EQB140 | EQB160 | EQB180 | EQB210 | ||||
4BTA3.9 | 4B3.9 | 4BT3.9 | 4BTAA3.9 | |||||
6BTA5.9 | 6BTAA5.9 | 6BT5.9 | ||||||
C230 | C245 | C260 | C280 | C300 | 6CTA8.3 | 6CTAA8.3 | 6CT9.5 | 6CTAA9.5 |
6CT8.3 | ||||||||
L270 | L280 | L290 | L300 | L315 | L325 | L340 | L360 | L375 |
6LTAA8.9 | 6LTAA8.9 | |||||||
QSB4.5 | QSB6.7 | |||||||
QSL8.9-C220 | QSL8.9-C240 | QSL8.9-C260 | QSL8.9-C280 | QSL8.9-C295 | QSL8.9-C300 | QSL8.9-C325 | QSL8.9-C340 | QSL8.9-C360 |
ISLe270 | ISLe290 | ISLe310 | ISLe315 | ISLe325 | ISLe340 | ISLe360 | ISLe375 | ISLe400 |
ISB3.9-125E40A | ISB3.9-140E40A | ISB3.9-160E40A | ||||||
GSZ13-C525 | GSZ13-C550 | GSZ13-C575 | GSZ13-C450 | GSZ13-C475 | GSZ13-C500 | GSZ13-G2 | GSZ13-G3 | |
ISDe140 | ISDe160 | ISDe180 | ISDe185 | ISDe198 | ISDe200 | ISDe210 | ISDe230 | ISDe245 |
ISDe270 | ISDe285 | ISDe300 | ||||||
K19-G2-TA | K19-G3-TA | K19-G4-TA | K19-G5-TA | K19-G6-TA | K19-G6A-TA | |||
K38-G2-TA | K38-G2A-TA | K38-G5-TA | K38-G9-TA | K38-G9A-TA | ||||
K50-G3-TA | K50-G8-TA | |||||||
M11 | GSK19 | QSK38 | ||||||
NTA855-G-TA | NTA855-G1-TA | NTA855-G1A-TA | NTA855-G2-TA | NTA855-G2A-TA | ||||
ISM340E | ISM380E | ISM405E | ISM440E | ISM308 | ISM345 | ISM420 | ISM335 | ISM360 |
ISME380 | ISME11E4 | ISME11E5 | ||||||
QSM11-G | GSM11-G3/4 | GSM11 | ||||||
ISF2.8s4107p | ISF2.8s4129p | ISF2.8s4129T | ISF2.8s4148T | ISF2.8s4161p | ISF3.8s3141 | ISF3.8s3154 | ISF3.8s3168 | |
QSX15-600 | QSX15-440 | QSX15-425 | QSX15-375 | QSX15-360 | ||||
QSC8.3-340 | QSC8.3-320 | QSC8.3-300 | QSC8.3-280 | QSC8.3-260 | QSC8.3-240 | |||
B3.3-85 | B3.3-80 | B3.3-65 | B3.3-60 | QSB3.3-80 | QSB3.3-85 | QSB3.3-99 | QSB3.3-110 |



Shiyan Xinghong Machinery Co., Ltd is a Professional engine spare parts supplier for truck, marine, construction machinery, power generation equipment.
Piston, Piston Ring, Piston kit, Turbocharger, Fuel Pump, Oil pump, Water Pump, Cylinder liner, Cylinder head, Rocker Arm, Fuel injector, Sensor, Gasket, ECM, Crankshaft, Camshaft, Engine connecting, Tensioner belt, Connecting Rod, Intake Valve, Starter Motor, Alternator, Filter...Available
Our main products include :
1, B, C, L, QSB, QSL9, QSM11, QSZ13, X15, NTA855, M11, K19, K38, K50 Engine Spare Parts.
2. C320D, C7, C9, C11, C13, C15 Engine Spare Parts.
3. 4D95, 6D102, 6D107, 6D114, 6D125, 6D140 Engine Spare Parts.
4. D6D, D6E, D7D, D7E, D11, D13 Engine Spare Parts.
5. 4TNE84, 4TNE94, 4TNE88, 4TNE98 Engine Spare Parts.
6. R215LC-7, R225LC-7, R275LC-7, R305LC-7, R335LC-7, R385LC-7, R495LC-7 Engine Spare Parts.
Global Market:
Asia: South Korea, Japan, India, Indonesia, Malaysia, Singapore, Thailand, Vietnam...
America: USA, Canada, Columbia, Mexico, Brazil....
Middle east: U.A.E, Israel, Egypt, Saudi Arabia, Oman...
We sincerely wish to establish long-term and firm business relationship and friendship with each new and old customer.
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Mostly goods can send within one week. For large quantity order, need about one month to prepare.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Send Message