Categories
|
|
ZHONGHE NEW ENERGY ELECTRICAL ENGINEERING (QINGDAO) CO. LtdFounded in 2002, but the company′s roots can be traced back to the time of 1996, since then we start the trip of electrical field. We are the manufacturer of electrical equipment, focus on design, customize and develop Traction Power System, DC Operating Power System, Rail Transit Testing Devices and etc. By 21 years′ effort, we are proud to be a leading supplier in the following areas, to research and develop, to ensure these technological breakthroughs reached customers. 1- Professional Supplier for DC Power Supply equipment in the filed of Metro, High-speed train and Rail Transit. 2- Professional supplier for Rail transit tooling equipment (like Speed simulation device, Rail Transit Test devices, acceleration sensor detection device, standard rolling stock reconnection test device and more)3- Professional supplier for DC Power Supply in the filed of Power plant, substation, industrial, minding and etc. 4- Since 2022, we step into new energy filed, start to manufacture EV Charger and provide Battery. Projects: 2004 - Electric Locomotive Project of CSRZHONGHE Supplied and Supported: GYA DC Power Supply System2006- Electric Locomotive Project in VenezuelaZHONGHE Supplied: Traction Power System (Traction Rectifier)2009- Electric Train Project in IranZHONGHE Supplied: 120 sets of 3phase Isolation transformers2012- Electric Locomotive Project in Sri LankaZHONGHE Supplied: DC Power Supply System2014- Electric Train Project in AngolaZHONGHE Supplied: DC Power Supply System2017- Traction substation project in Chengdu Base of CRRC. ZHONGHE Supplied and Supported: Traction Power System and DC Power Supply System2019- Traction substation Project of CRRC QINGDAO SIFANG Co., LtdZHONGHE Supplied and Supported: Traction Power System and DC Power Supply System2021- Chongqing Metro Traction Substation ProjectZHONGHE Supplied and Supported: Traction Power System and DC Power Supply System2022- ZHONGHE start to Design and Manufacture EV Charing Station International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, CIP Terms of Payment: LC, T/T, Western Union Average Lead Time: Peak Season Lead Time: one month, Off Season Lead Time: within 15 workdays Number of Foreign Trading Staff: 1~3 People Main Customer(s): Company Name | Country/Region | Products You Supply | CRRC | China | Traction power System, DC Power Supply System | Export Year: 2023-06-06 Export Percentage: >90% Main Markets: North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe Nearest Port: QINGDAO Import & Export Mode: Have Own Export License Production Capacity Factory Address: No.8, Shi-mei-an Road, Licang District, Qingdao, Shandong Province, China R&D Capacity: OEM, ODM, Own Brand(ZHONGHE) No. of R&D Staff: 5-10 People No. of Production Lines: 3 Annual Output Value: US$1 Million - US$2.5 Million Ever Annual Output of Main Products: Product Name | Units Produced (Previous Year) | EV CHARGER | 8000 Pieces | DC Power Supply System | 300 Sets | DC Switchgear | 200 Sets | Traction Rectifier | 200 Sets | |
Company Name: |
Zhonghe New Energy Electrical Engineering (Qingdao) Co. Ltd |
Location: |
Shandong |
Business Type: |
|
Establishment Date: |
2023 |
Business Range: |
EV Charging Station (EV Charger),DC Power Supply Panel(Battery Charger),Traction Rectifier,DC Switchgear (for Traction Power System),DC Charging Cabinet Power Supply and Distributio,Distribution Board,Car Charger DC Charger,Lithium Battery Charger,Electric Vehicle Charging Station,Electric Car Charging Station |
Main Business: |
|
|